An absolute joy to have been involved in this project. The client knew exactly what he wanted (and what he didn’t want). The builder was a genius. The architect – PL Projects – was focussed, firm, yet fair. And the team at ACSES Engineers just loved working on it.
ACSES Engineers designed both the bulk excavation solution and the various building structures. Utilising our finite element modelling (FEM) capabilities, we were able to eliminate the need for shoring works by taking advantage of the geotechnical parameters of the site. The FEM analysis verified that our vertical cut solution could safely be carried out without adversely impacting the neighbouring structures.
Again using our FEM expertise, ACSES Engineers designed the superstructure as a concrete framed solution made up of off-form reinforced concrete columns, walls and stairs. To achieve various parameters set by the architect, we designed the suspended slabs as post-tensioned solutions.
The level of detailing required for this master piece was ‘unbelievable’. From the concrete pool rising out of the ground with the infinity edges. To ‘the box’ suspended two levels over the Lower Ground Floor and cantilevering out 5m past its supports. To the off-form concrete walls almost 8m tall that needed to be poured in one go. To the ‘zig-zag’ stairs that could only be 100mm thick or the cantilevered stairs that could be no thicker than 110mm – the end results make all that work well worth the effort.
Congratulations to all involved.
ACSES Engineers are incredibly proud to have been part of the Design Team and honoured to have been the Project Structural Engineer for this development.
- Institute of Engineers Australia Recognition - April 1, 2019
- Engineering Executive Status Achievement - December 10, 2018
- Project: 538-540 Railway Parade Hurstville - September 25, 2017
- Project: 43-45 Beane Street Gosford - September 25, 2017
- Project: Chiswick, New South Wales - August 16, 2017
- Project: 1 Bede Street Strathfield - August 15, 2017
- Project: 1 Villawood Place Villawood - August 15, 2017
- Project: 5-7 Telegraph Road Pymble - August 14, 2017
- Project Location: 35 Devlin Street Ryde - August 11, 2017
- Project Update: 100 Castlereagh Street Liverpool - August 10, 2017