Shoring and Bulk excavation works at 298-300 Taren Point Road Caringbah are proceeding as planned. The boys from A.C.E Civil are doing a great job. ACSES Engineers are proud to be part of the Design Team and honoured to be the Project Structural Engineer.

298-300 Taren Point Road Caringbah

298-300 Taren Point Road Caringbah

Here are the 3D perspectives.

298-300 Taren Point Road Caringbah 3d Perspectives

 

 

 

About George Khalil

Principal Engineer with over 20 years experience encompassing business development, complex project management and technical design positions. Comprehensive knowledge of design standards and codes.