Apartment Buildings In Penrith And Jordan Springs
In Penrith and Jordan Springs, the engineering for an apartment building starts with reactive clay at the surface, salt in the soil and, in Penrith, the Nepean River floodplain. The basement goes down through the clay into shale, and the site levels and the concrete specification are set to suit the water and the salt.
Our projects here are Evoke, with 55 apartments over two basements on Lethbridge Street in Penrith, and two buildings on Lakeside Parade in Jordan Springs: Kala, with 84 apartments, and Geneva, with 79. Each Jordan Springs building has five storeys over two basement levels, and Evoke has seven.
The ground
Penrith sits on Bringelly Shale, part of the Wianamatta Group, with silty and highly plastic clay over it and river alluvium along the Nepean. Near the surface the shale has weathered to clay, and it gets harder further down.
How deep the sound shale sits changes from one borehole to the next. So the foundation level for each building comes from the investigation on that lot, never from the building next door.
Basements in clay and shale
A two-level basement in this ground passes through clay and weathered shale. Piles go in around the edge of the dig, with shotcrete sprayed between them as each stage is opened, because exposed shale softens as it wets and dries.
Water tends to arrive along the joints in the shale, or sit on top of the clay after rain. Groundwater in the Wianamatta shales tends to be brackish to saline, which matters for the next two parts of the design.
Reactive clay
The building's own footings go down to shale or onto piles, below the clay that moves. Everything light around it still sits on that clay, including the paths, the driveway, the low retaining walls and the garden beds, and the clay swells when it gets wet and shrinks as it dries.
Those elements have to move without pulling at the building. A joint goes in at the line between a path and the basement wall, and services entering the building are detailed for the movement. The background is in [reactive clay and how it decides your footing](/blog/reactive-clay-sites-footing-design-nsw).
Salt in the soil
Salt in the ground attacks concrete and brick from the outside in. Penrith City Council carries salinity controls in its development controls, and the test results on the site decide the concrete exposure class and the type of brick that can go below the damp-proof course. The detail is in [saline soils in Western Sydney](/blog/saline-soils-western-sydney-concrete-and-brickwork).
The floodplain
Penrith grew up beside the Nepean River, and parts of the city sit on its floodplain. Where a site is mapped as flood affected, the council's flood planning level sets the ground floor level, and the basement entry has to sit above it, with a crest at the top of the ramp so floodwater can't pour down into the car park. The wider approach is in [engineering for flood-prone sites](/blog/engineering-for-flood-prone-sites).
The civil design then takes the roof and surface water through pits, pipes and on-site detention before it leaves the site, sized to the council's rules.
The frame above
Kala and Geneva combine a concrete structure with steel and timber framing, which keeps the upper floors light over the concrete basement. The joins between those materials need their own details, as set out in [concrete, steel and timber in the same building](/blog/concrete-steel-and-timber-in-one-building).
Evoke on Lethbridge Street is a concrete frame with conventionally reinforced floors. Value engineering and a risk assessment were part of that scope as well.
The neighbours and the site
All three projects included the shoring and bulk excavation design, with the lateral support and underpinning for the buildings next door, and dilapidation reports before and after construction. We carried out the construction supervision and the pre-pour inspections on site ourselves.
How we approach it
We put the borehole logs, the salinity results and the flood map side by side at the start, because each one changes a different part of the building. The civil, geotechnical and structural design then work from the same levels, so the floor level the flood map sets is the same level the footings and the ramp are drawn to.
In Penrith, the flood map and the salt test belong on the desk before the first drawing does.
ACSES provides civil engineering in Penrith and structural engineering in Penrith. Talk to us about a project.