Stacking industrial units puts warehouse loads on suspended floors. Pallets, racking, forklifts and vans that would normally sit on a ground slab are carried by beams and columns instead, so each upper floor is designed for its heaviest use before any unit is sold or leased.

Our industrial work includes the Loop Industrial Estate on Planthurst Road in Carlton, with 12 industrial units on four levels over a basement, and a building on Anzac Street in Greenacre with two steel-framed storeys over a ground floor, holding two industrial units.

Floor loads

AS/NZS 1170.1 sets the imposed loads for storage and industrial floors, and storage loads rise with the height goods are stacked to. Forklifts and pallet jacks add wheel loads that press on a small area, so a slab gets checked locally under a wheel as well as across the whole bay.

The design load for each level belongs on the drawings and in the information given to buyers and tenants. An owner who knows what the floor was designed for can plan racking around it, and an owner who doesn't can overload it without knowing.

The ground floor

At ground level, the floor is often a slab on ground, designed for racking legs and forklift traffic, as set out in [warehouse floor slabs and racking loads](/blog/warehouse-floor-slabs-and-racking-loads). Where a basement sits under the building, the ground floor becomes a suspended slab as well, and it is designed for the same industrial loads over the car park.

Getting goods upstairs

Units above the ground floor need a way to move goods up and down. That can be a ramp for vans or trucks, a goods lift, or a loading area with a hoist.

A ramp carrying trucks is a heavy suspended structure. It is designed for the axle loads of the largest vehicle allowed on it, plus the braking and turning forces at the top and bottom, with grades and transitions that suit that vehicle. The same thinking applies to loading areas, covered in [loading docks and heavy vehicle slabs](/blog/loading-docks-and-heavy-vehicle-slabs).

Steel over concrete

At Greenacre, two steel-framed storeys sit over the ground floor. Steel keeps the frame light and the spans long, which suits open units, and in a steel frame like this the upper floors are often concrete cast on steel decking, working with the beams as one composite floor. The way those floors behave is described in [composite steel and concrete floors](/blog/composite-steel-and-concrete-floors).

Roller doors and bracing

Each unit wants a wide roller door at the front. A wall full of roller doors leaves little room for bracing, so the frame gets its stability from somewhere else: braced bays where the doors aren't, portal action in the frame, or a concrete core with the floors bracing back to it. The portal frame side is set out in [steel portal frames for warehouses](/blog/steel-portal-frames-for-warehouses).

Fire and the building class

Under the NCC, warehouses are Class 7b and factories and workshops are Class 8. Once storeys are stacked, the floors need a fire resistance level, which the fire engineer and the certifier set, and the slabs, beams and columns are designed to hold it.

Fit-out and later change

Owners of industrial units add mezzanines, racking and plant over the years. Each one changes the load on a floor designed for a stated use, so any mezzanine or new hole through the floor gets checked by an engineer before it goes in. A floor plan showing the beams and the slab zones that can take a new opening saves each owner paying to find that out again.

The site work

At Carlton, our scope included the shoring and bulk excavation design, with the lateral support and underpinning for the buildings next door, and dilapidation reports before and after construction. On both projects we designed the foundations and the frame, and carried out the construction supervision and the pre-pour inspections.

How we approach it

We design these buildings around what the owners will do with them, not only around the first tenant. The floor loads, the vehicle access and the bracing are settled together, because a truck ramp, a heavy floor and a wall of roller doors all compete for the same frame.

In an industrial unit building, every floor is a ground floor to the tenant standing on it.

ACSES provides structural engineering for industrial and commercial buildings across Sydney. Talk to us about a project.

Building Relationships Beyond Structures

George Khalil

George Khalil

Founder & Principal Engineer

almost three decades of structural, civil, and geotechnical engineering experience across 1,000+ projects.

Industrial UnitsWarehousesFloor LoadsSteel FramingStrata Industrial

Tell us about your project.

We will respond with a clear understanding of how we can assist.

Partner With Us