Skip to main content
Project Showcase

Taren Point Road Caringbah: Commercial Development Engineering

George KhalilFounder & Principal Engineer5 min read
Taren Point Road Caringbah: Commercial Development Engineering

Taren Point Road Caringbah

The Taren Point Road commercial development in Caringbah required structural solutions optimised for commercial loading conditions in the Sutherland Shire.

Commercial Requirements

Commercial buildings have different structural requirements than residential developments. Floor loadings are typically higher, column-free spans are larger, and floor-to-floor heights must accommodate commercial services distribution. The Taren Point Road project was designed to meet these requirements efficiently.

Structural System

We selected a reinforced concrete frame with post-tensioned band beams to achieve the required spans while maintaining economical floor-to-floor heights. The system provided flexibility for tenant fitout and accommodated the services requirements of commercial occupancy.

Foundation Design

The Sutherland Shire's geological profile, featuring Hawkesbury Sandstone at relatively shallow depth, provided excellent founding conditions. Pad footings on rock were the most economical foundation solution, eliminating the need for piling and reducing construction cost and programme.

George Khalil

George Khalil

Founder & Principal Engineer

almost three decades of structural, civil, and geotechnical engineering experience across 1,000+ projects.

Caringbahcommercial developmentSutherland Shirestructural design

Tell us about your project.

We will respond with a clear understanding of how we can assist.

Partner With Us